| Station: | Palima | Continent: | Africa | ||
| River: | Bundoya | Major Basin : | Sewa | ||
| Country: | Sierra Leone | Discharge into : | |||
| Observation Period: | 1976 - 1979 | Total Months: | 45 | ||
| Latitude (dec deg): | 8.18 N | Area (km2): | 361 | ||
| Longitude (dec deg): | 11.46 W | Elevation (m): | 14 | ||
| Annual Discharge: (m3/s): | 26.8 | (km3/yr): | 0.9 | ||
| Annual Runoff: (l/s/km2): | 75.9 | (mm/yr): | 2392.2 |
| Mean for Observation Period | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| m3/sec | 5.0 | 2.0 | 0.8 | 0.8 | 2.9 | 11.8 | 26.1 | 54.0 | 62.1 | 53.2 | 99.2 | 10.3 |
| km3/mo | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.1 | 0.2 | 0.1 | 0.3 | 0.0 |
| mm/mo | 37.1 | 13.2 | 5.9 | 5.7 | 21.7 | 84.5 | 193.8 | 400.6 | 446.1 | 395.1 | 712.0 | 76.4 |
| l/s/km2 | 13.9 | 5.5 | 2.2 | 2.2 | 8.1 | 32.6 | 72.4 | 149.6 | 172.1 | 147.5 | 274.7 | 28.5 |